Project History
An experienced service provider with a proven track record throughout North and Central America
Please use the map and table below to learn about some of the projects Wave Wind has completed on behalf of its clients.
Note: Zoom in to access markers located in clusters (e.g., the cluster of markers in North West Texas).
| Client |
Location |
Date |
Work Done |
Service |
| AAER |
Tehachapi, CA |
2009 |
Erected two AAER 1500 units. |
Turbine Construction |
| Aubrey-Silvey |
Hermiston, OR |
2008-2009 |
Erected 27 Vestas V82 units (80 meter towers). Contracted via Mullen. |
Turbine Construction |
| BNSF |
Lubbock, TX |
2008 |
Offloaded two army tanks. |
Material Handling |
| Eagle Rock |
Cheyenne, WY |
2009 |
Erected one Gamesa unit. |
Turbine Construction |
| Eco Energy |
Shannon, IL |
2009 |
Installed eight anemometers on existing wind turbines. |
Turbine Construction |
| Enel Corp. |
Liberia, Costa Rica |
2008 |
Performed maintenance on Vestas NM750 units. |
Turbine MRO |
| Entegrity Wind System |
Rockwall, TX |
2009 |
Erected one 50 kW Entegrity unit (single turbine and self-supporting tower). |
Turbine Construction |
| enXco |
Lubbock, TX |
2009 |
Stored 50 complete units. Project is ongoing. |
Material Handling |
| General Electric |
Lubbock, TX |
2007-2009 |
Offloaded and stored $400 million of wind turbine components. Project is ongoing. |
Material Handling |
| General Electric |
Somerset, PA |
2007 |
Transloaded 100 MW units (75 total). |
Material Handling |
| General Electric |
Carr, CO |
2009 |
Offloaded 48 blades for GE (one train with 30 cars required). |
Material Handling |
| John Deere Renewables |
Hermiston, OR |
2008-2009 |
Blade washing, inspections and repairs for Vesta units. |
Turbine MRO |
| John Deere Renewables |
Boardman, OR |
2008 |
Cosmetic and structural blade repair for Suzlon units. |
Turbine MRO |
| Mullen Crane |
Goldendale, WA |
2008 |
Offloaded Repower WTG's. |
Material Handling |
| Noresco |
Guantanamo, Cuba |
2009 |
Performed maintenance on four Vestas NEG Micron 900 kW units. |
Turbine MRO |
| North Wind Power |
Somerset, PA |
2007 |
Installed two met towers. |
Turbine Construction |
| Pyco |
Lubbock, TX |
2007 |
Transported, unloaded and erected 10 Furlander units (1 MW). |
Material Handling, Turbine Construction |
| Shell |
West Virginia |
2008 |
Erected six Gamesa units (contracted via NED Power). Also, dismantled and re-erected one heavily damaged wind turbine. |
Turbine Construction |
| Suzlon |
Big Spring, TX |
|
Replaced turbine blades. |
Turbine Construction, Turbine MRO |
| Suzlon |
Gruver, TX |
2007-2008 |
Retrofitted blades and replaced rotors on 33 Suzlon S88 units. |
Turbine MRO |
| Suzlon |
Woodward, OK |
2008-2009 |
Retrofitted Suzlon S88 units. |
Turbine MRO |
| Suzlon |
Gruver, TX |
2008-2009 |
Retrofitted blades and replaced rotors on 33 Suzlon S88 units. |
Turbine MRO |
| Suzlon |
Somerset, PA |
2008 |
Replaced blades and removed rotor for Suzlon S88 units. |
Turbine MRO |
| Suzlon |
Sunray, TX |
2008 |
Completed punchlist work on S64 unit John Deere 7-11. |
Turbine MRO |
| Suzlon |
Winnebago, MN |
2008 |
Replaced blades on Suzlon S88 units. |
Turbine MRO |
| Vestas |
Malone, WI |
2008 |
Changed out gear boxes on V82 units (1.65 MW). |
Turbine MRO |